Unit Costs
This page contains the Equipment, Material, and Labor Unit Costs used by the model to calculate activity-specific Per Mile Costs. Unfortunately, at this time, the user is not able to edit these Unit Costs. However, the user has the ability to override the activity-specific Per Mile Costs that are calculated based on these unit costs.
Equipment
Material
Labor
- Laborer Grp 1: $180.00
- Operator Grp 2: $200.00
- Operator Grp 3: $200.00
- Prod Foreman: $225.00